Long time no post
It's been a busy few weeks...when the NW got the big wind storm a few weeks ago we lost power, you knew that, but the rest of the weekend was rough too...water in the basement from the rain, a leak in the waste pipe from the kitchen...ugh. Well this past weekend the plumbing to and from the kitchen was replaced...The old galvanized steel supply lines were replaced with Pex (plastic) and the old waste was replaced with ABS (also plastic). No more 1940's technology for the kitchen! Of course, the main bathroom is still on the old stuff...
It was a great way to end 2006 and start '007. Here are the Pex manifolds (hot on the bottom and cold on top).
It was a great way to end 2006 and start '007. Here are the Pex manifolds (hot on the bottom and cold on top).
0 Comments:
Post a Comment
<< Home